The industrial maintenance company Run Electro MECA is developing a preventive maintenance approach that, by maximizing the availability and performance of production equipment, reduces their operating cost. His master word : anticipate.
The message is clear : "Maintenance plays a central role in the reliability and availability of industrial equipment. A well -maintained machine works longer, falls less often and constantly produced, Without loss of quality. "Run Electro Meca was created a year and a half ago to complete the field of intervention of Svmoi to all industrial equipment. The young company is organized to respond to emergency repair requests, But it mainly defends a preventive approach to maintenance. The technical deficiencies that she finds in many companies are the cause of additional operating costs, which are in the end in the final price of the products. It is in front of this observation that Run Electro Meca decided to develop a full preventive maintenance offer, only able to provide lasting solutions to manufacturers to improve their performance. The company puts a set of technical skills at the service of companies, but also of maintenance governance (see box).
Better to prevent than cure
"Preventive maintenance is an education which begins with the awareness of its issues", says William Foudrain, Founder and director of Run Electro Meca. To locate these issues, He quotes metropolitan source figures, But completely probable locally. On average, Unplanned machine stops lead to a loss of 323 hours of production per year, Almost 14 days. The cost, According to ADEME varies from 3 % to 8 % of turnover depending on companies. Expenses linked to the machinery of the machines are 4 to 15 times higher than the average budget for preventive industrial maintenance. Maintenance budgets are often underestimated, which leads to premature wear of equipment, non -planned stops and significant energy losses linked to ineffective or degraded operation of machines. The additional advantage of preventive maintenance as designed by Run Electro Meca, it is that by scrupulously taking into account manufacturer recommendations and the real conditions of use of machines, it can be budgeted with precision.
Avoid emergency repairs
Run Electro Meca recommends management of computer -assisted maintenance (Gmao) : It is an essential tool to anticipate and plan all maintenance operations, Starting with the key point of ordering of spare parts. The other choice in terms of cost at this level should not be overlooked : a lower cost per boat thanks to the anticipation of needs or the high price by aircraft in the urgency of a repair. Note that, in the latter case, Run Electro Meca played a partnership with the Vion freight company, in order to quickly bring critical components. "The objective is also that the machines consume as little energy possible", underlines William Foudrain, which argues that maintenance contributes to the low carbon strategy of companies. Reason why Run Electro Meca systematically integrates the measurement of energy performance, as well as the leak search, in its maintenance services.
Maintenance at Run Electro Meca
• Advice on installation, security, use and maintenance of machines.
• Pre-audit (first examination) free production equipment for needs assessment.
• in -depth audit of production equipment and their operation.
• Measuring their energy performance.
• Food search.
• Implementation of a GMAO.
• Training of operators in the identification of signals for the dysfunction of machines and good maintenance practices.
• Repair interventions.